Project Summary
Complete reconfiguration of spaces in the house in order to save space and resolve water infiltration and mold problems.
Year of production
2020
Completion schedule
6 month
Budget
$435,000 plans, engineer, renovation and taxes included
Customer needs
The residence had problems with water infiltration, rot and mold in various areas, creating an unhealthy environment. At the same time, as needs evolved with an expanding family, a reorganization of the space proved imperative. Among these priority needs was the need to add bedrooms and bathrooms to meet the family’s growing demands.
Services and scope of renovations carried out by the general contractor
Design: plans and drawings with engineer’s seal
Interior demolition
New structure of the house without extension
New exterior cladding
Exterior doors and windows
Alternative for the staircase
Partitioning for walls and interior finishing
New kitchen (counters and cabinets)
Fireplace with built-in seating area
New laundry room
New bathroom and attic bathroom repair
Transformation of a closet into an 8 x 4 foot walk-in closet
Walk-in entrance
New bedroom
Landscaping work
New kitchen (counters and cabinets)
Heating floor
Space configuration of the renovated house
Basement
Family room with fireplace, dining room, kitchen, bedroom, bathroom and mechanical room
Ground floor
Main entrance, office, bathroom, bedroom and access to outdoor terrace
Floor
Bedroom and bathroom
BEFORE
AFTER
BEFORE
AFTER
Other relevant information on the renovation project
Design of a multi-story staircase connecting the 3 floors
Sherwin Williams Paint, 0-5% Gloss Latex/Matte Ceilings and Anti-Mildew Acrylic Latex Paint for Bathrooms
Basement floors are concrete painted in water-based polyurethane
Ground floor in brushed white oak and 2×2 ceramic flooring for the bathroom
Kitchen with cabinet from the Legano collection with white top doors, Ceasarstone quartz countertop, chimney range hood, kitchen island